Severity: Notice
Message: Only variable references should be returned by reference
Filename: core/Common.php
Line Number: 257
We can provide engineering for the installation and burial of inter array cables which are used to transfer electricity from the wind turbines to the offshore substations. We also perform engineering for export cables running from onshore substation grid connection to offshore substation.
Our solutions include: